Practical examples

For now this page contains only worked calculation examples: they show how a calculator is used on a typical task, but they are not measurements from a real site. Documented examples from real jobs will be added when they are available.

Content changed:

Worked calculation examples

Each example shows the inputs, assumptions and the calculation as the calculator produces it. The examples contain no real consumption, which may differ from the calculation.

Floor tiles for a room with packaging from the label

Illustrative calculation example — not a documented job from a construction site.

Rectangular room, straight laying. The pack size in this example is a value the user would copy from the box, not an assumption of the calculator.

  • There are no openings or built-in elements on the floor.
  • Reserve for simple laying, as set in the calculator.
  • Offcuts from cut tiles are not counted in the purchase.
Floor tiles for a room with packaging from the label
ItemValue
Inputs
Floor (length × width)4.20 m × 3.50 m
Tile size60 × 60 cm
Joint width2 mm
Reserve (simple laying)+5 %
Pack size (from the box)1.44 m²
Procedure
Area4.20 × 3.50 = 14.70 m²
Area including reserve14.70 m² × 1.05 = 15.44 m²
Number of tiles15.44 / 0.36 → 43 pcs
Boxes15.44 / 1.44 → 11 × 1.44 m² = 15.84 m² (44 pcs)
Result before reserve and rounding
Area14.70 m²
Final result (to buy)
Tiles (boxes)11 × 1.44 m² = 15.84 m² (44 pcs)
Adhesive (bags)93 kg → 4 × 25 kg
Grout (packs)2 kg → 1 × 5 kg

The link opens the calculator with this example's inputs filled in; you can change them.

Enter manually: Pack size (from the box).

Open the related calculator: Ceramic Tiles

Skim coat and paint for a room with a window and a door

Illustrative calculation example — not a documented job from a construction site.

Walls and ceiling of one room; the window and door area is deducted from the walls.

  • Walls and ceiling get the same number of coats.
  • Windows and doors are entered as their total opening area.
  • The calculator adds no reserve; surplus comes only from rounding to packs.
Skim coat and paint for a room with a window and a door
ItemValue
Inputs
Room4.00 × 3.00 m, h = 2.60 m
Windows (total)1.50 m²
Doors (total)1.60 m²
Skim coat rate (two coats)1.5 kg/m²
Paint rate (per coat × coats)0.125 L/m² × 2
Procedure
Walls2 × (4.00 + 3.00) × 2.60 − 1.50 − 1.60 = 33.30 m²
Ceiling4.00 × 3.00 = 12.00 m²
Skim coat45.30 m² × 1.5 kg/m² = 67.95 kg → 68 kg
Paint45.30 m² × 0.125 L/m² × 2 = 11.33 L → 12 L
Result before reserve and rounding
Total area45.30 m²
Skim coat67.95 kg
Paint11.33 L
Final result (to buy)
Skim coat (bags)3 × 25 kg = 75 kg
Paint (buckets)1 × 15 L = 15 L

The link opens the calculator with this example's inputs filled in; you can change them.

Open the related calculator: Paint, Putty & Plasterboard

Concrete slab with a stair opening

Illustrative calculation example — not a documented job from a construction site.

One slab with one rectangular opening; volume to order with reserve and rounding.

  • The opening is deducted through the full slab thickness.
  • The reserve covers losses during placing, not changes in dimensions.
  • Mass is an estimate based on the density of fresh concrete.
Concrete slab with a stair opening
ItemValue
Inputs
Slab6.00 × 4.00 m, d = 0.15 m
Slab opening1.00 × 2.50 m
Reserve5 %
Volume rounding0.1 m³
Procedure
Volume without opening6.00 × 4.00 × 0.15 = 3.600 m³
Opening volume1.00 × 2.50 × 0.15 = 0.375 m³
Volume3.600 − 0.375 = 3.225 m³
Volume including reserve3.225 × 1.05 = 3.386 m³
Rounding up3.386 → 3.4 m³
Result before reserve and rounding
Volume3.225 m³
Final result (to buy)
Volume to order3.4 m³
Mass≈ 8127 kg

The link opens the calculator with this example's inputs filled in; you can change them.

Open the related calculator: Concrete

Documented examples from real jobs

There are no published documented examples yet. Each future example will state the data source and date, the quantity bought and the quantity used separately, the measured leftover and waste, and an explanation of any deviation.

Calculation methodology and checks